A task can now be assigned to several people, a supervisor can correct the Time Spent total without rewriting anybody’s timer entries, and the task list’s search, sort and filters finally reach the Project, Assignee and Status columns it displays.
The Task List Searches, Sorts and Filters the Columns It Displays
The task list’s search box only ever looked at the task’s own fields, so searching for a project or an assignee — both plainly on screen — returned nothing, which reads as a broken search. It now covers what the grid shows: task, project, category, priority and assignee, employees and contacts alike.
Three related faults are gone with it:
- The box now means one phrase. Searching “Website Creation” used to return a task called “Creation of banner” on a project called “Website Redesign” — a row containing neither of the words the user typed together.
- Typing anything into the box raised a server error, because the search named two fields a task does not have. An unsearched list loaded fine, which is why it went unnoticed.
- Sorting and filtering on Project, Category, Priority and Assignee were being dropped in silence — the click did nothing and said nothing. Status now filters by picking from the real list rather than by typing a label that never matched, and the export answers to the same column names the grid filters on, so a download matches what is on screen.
Paging is steadier too: rows sharing a creation timestamp could previously swap between page fetches, showing one task twice and another not at all.
A Task Can Be Assigned to More Than One Person
A task carried exactly one assignee, so shared work had to be duplicated into a task each. A task — and a recurring task definition, so every occurrence it generates — can now name additional assignees alongside the primary one.
The primary assignee is unchanged and remains the one owner every existing report, notification and filter reads, so nothing that worked before changes meaning. What the co-assignees add is visibility: a task whose primary owner sits outside your part of the organisation is still yours if you are on it, and it appears in your list accordingly.
A Supervisor Can Correct the Time Spent Total
The Time Spent figure on the task list is now editable, and the cell also opens the full list of time entries behind the total — everyone’s entries, not just your own — so a number can be explained before it is changed.
Correcting the total is a supervisory act: the assignee’s supervisor, anyone above them in the chain, or a system administrator. The person whose hours they are cannot quietly restate them.
Timer entries are facts and are never rewritten. The difference between what the timers recorded and the total asked for is carried by a single adjustment entry, recalculated on each edit rather than stacking up a new row every time somebody changes their mind. Two things are refused by name: a total below what the timers already logged — the honest way to remove logged time is to correct the entry that logged it, and the message says how much is logged — and any edit while a timer is still running.